Corris Hill Railway videosThese are in Microsoft Windows Video format (.wmv). Click on a picture to start the video. |
 |
Snowploughing with Maverick (14 secs, 0.6MB, 848x480) |
 |
Snowploughing with Maverick (1 min 45 secs, 4.2MB, 848x480) |
 |
Honey Badger petrol electric loco (9 secs, 0.4MB, 640x480) |
 |
Run round the line with Honey Badger petrol electric loco (3 min 12 secs, 7.7MB, 640x480) |
 |
Run round the line with the Coronation fitted with the Trax DESM-2 diesel engine sound module (3 min 24 secs, 8.1MB, 640x480) |
 |
Trax DESM-2 diesel engine sound module fitted in the Coronation (34 secs, 1.4MB, 640x480) |
 |
George the tram goes right round the completed phase 3 extension (2 min 41 secs, 6.4MB, 640x480) |
 |
Maverick clearing snow from the line (24 secs, 0.4MB, 320x240) |
 |
Dixie climbing up the line (1 min 15 secs, 1.2MB, 320x240) |
 |
High speed run around the line behind George the tram before the loop round the shed was added (1 min 12 secs, 1.2MB, 320x240) |